Front of Church
First photo of the beginning of the inspection.
Side entry
Lifted damaged shingles abovethe side entry
Damage Shingles
Raised shingles that became slightly detached
Damage Markings
Hail strike markings
View of Valley
Damage to the valley, lifted shingles, and the ridge
Shingle Removal
Beginning of shingle removal on the lower pitch of the building
New Materials
Laying of new Sealoron XT Ice and Water Shield and VeloraOne Synthetic Underlayment
View of Lower Pitch
Shingles and other materials are being prepped for installation
View of Highest Pitch
Shingle installation on the highest pitch of the building
Completed Shingle Placement
View of lower-pitch shingle placement
Highest Pitch
View of completed highest pitch shingle placement
